Bags vs Ready-Mix Concrete: Compare at Your Prices
One cubic yard is 45 bags of 80 lb Quikrete Concrete Mix: 3,600 lb to lift, haul and mix. A ready-mix plant delivers it mixed, but NRMCA notes “The capacity of truck mixers varies between 8 to 12 cubic yards”, so small orders often carry a minimum or short-load fee. Compare both at your own prices below.
Set up for: a slab, bags or a truck · Different project?
FAQ
When should I order ready-mix instead of bags?
Compare the bag count, total weight and number of mixes with the plant's minimum order and fees at your own prices; the calculator shows both totals. We don't set a cut-off.
What should I ask the ready-mix plant?
Its minimum order and short-load fee, the strength and slump it suggests for your use, how close the truck can get (chute reach or a pump), and how long the driver will wait.
Sources
- NRMCA: CIP 31: Ordering Ready Mixed Concrete · fetched and reviewed 2026-11-10
- Quikrete: QUIKRETE Concrete Mix (No. 1101) data sheet · fetched and reviewed 2026-11-10
- Ask Extension (Cooperative Extension): How much soil for raised beds · fetched and reviewed 2026-11-10
Volumes only. ConcreteMath calculates volumes, bag counts, weights and your own cost figures. It gives no structural or engineering advice and never sizes footings, piers, slabs or rebar: those come from your plans, an engineer or your local building department. Bag counts are estimates from each maker's published yield; actual use varies with hole shape, uneven ground, waste and mixing. Bulk weights are published ranges; your supplier's figure wins.